Tuesday, September 09, 2014

Minor setback

 Unfortunately my hope that the kitchen renovations would not consume my time  has hit a snag. The contractor we hired to do the work appears to have lost interest in the project, and gone AWOL.  We've been left with a demo'ed main floor, with drywall installed on the walls and ceiling. I tried my hand at mudding and taping, but that lasted for about a day. I'm going to have to get some professional help for that part. However, the rest of the painting, flooring, cabinetry, plumbing and electrical is now going to be up to me.